{"id":1404,"date":"2010-03-15T17:21:22","date_gmt":"2010-03-16T01:21:22","guid":{"rendered":"http:\/\/wineintheshower.com\/?p=1404"},"modified":"2010-04-25T06:25:13","modified_gmt":"2010-04-25T14:25:13","slug":"diggin-holes","status":"publish","type":"post","link":"http:\/\/docker.vsl:8080\/index.php\/2010\/03\/15\/diggin-holes\/","title":{"rendered":"Diggin’ Holes"},"content":{"rendered":"

\"IMG_0015\"<\/p>\n

I went out to help my friend Ray put posts in for his new vineyard at Highland Valley<\/a>.\u00a0 It was a great day, although we had Santa Ana winds.\u00a0 That means nice warm, clear weather, and it also means strong gusts of wind up to 35 mph.\u00a0 There were a few times we had to just stop what we were doing and try not to get blown over.<\/p>\n

We had a few other glitches besides the high winds.\u00a0 After installing about 5 posts, the auger we had stopped working.\u00a0 Ray had to go rent another one, which gave us a chance to really enjoy the beauty of the area.<\/p>\n

\"IMG_0026\"<\/p>\n

\"IMG_0019\"Once we got another auger, things went pretty quickly.\u00a0 There were 5 of us total, and we installed 48 posts in about 4 hours of work.<\/p>\n

\"IMG_0036\"\"IMG_0041\"<\/p>\n